US 18 (Sunset Drive)WIS 67 to Moraine View Drive, Waukesha County
Project Overview
The proposed work to the roadway will be milling 3 inches and a 4-inch overlay, along with joint repairs and base patching, replacing the existing concrete curb & gutter at County P (other curb & gutter along the roadway will remain in place), replacing beam guard at four locations, cleaning out several of the existing storm sewer outfall pipes and cross culverts, the existing traffic signals at County C will be improved, and all the permanent signing and pavement markings along the roadway will be replaced.
SCHEDULE
Construction begins: Mid-July 2022
Anticipated completion: Mid-November 2022
Click HERE for more information
This project will be closed and detoured using WIS 67, I-94 and WIS 83.